{"id":"p2-fm-priority","title":"Prioritizing maintenance by facility service impact","summary":"Editorial proposal. Link asset numbers to areas of use and consider fault impact, services that can be routed around the fault, operating hours, and confirmed safety concerns together. Do not prioritize solely by the number of requests.","concepts":["Editorial proposal. Link asset numbers to areas of use and consider fault impact, services that can be routed around the fault, operating hours, and confirmed safety concerns together. Do not prioritize solely by the number of requests.","Even alarms from the same equipment can have different effects when they interrupt a critical space or cause local inconvenience. Propose work windows by combining technical staff assessments with interruption windows confirmed by facility user departments.","Record the basis for urgency, unverified on-site conditions, approvers, and the next inspection time. The relevant technical specialists diagnose fault causes and make technical safety judgments."],"application":"Applies when asset registers, usage schedules, and maintenance requests are linked for an operating building.","limitations":"Do not determine shutdown conditions for specialized facilities such as hospitals or data centers using this general proposal. Appointment and inspection responsibilities for Korean facilities by size and use have not been verified. The Polegate example concerns mainly public facilities and differs from commercial mixed-use buildings.","directions":["Scope of application: Applies when asset registers, usage schedules, and maintenance requests are linked for an operating building.","Check before deciding: Do not determine shutdown conditions for specialized facilities such as hospitals or data centers using this general proposal."],"category":"Construction, energy, environment and field technology","kind":"method","kind_label":"Method","persona_ids":["facilities-manager"],"revision":1,"updated_at":"2026-10-25T11:16:14.675Z","sources":[{"title":"O*NET Facilities Managers 11-3013.00","url":"https://www.onetonline.org/link/summary/11-3013.00","publisher":"www.onetonline.org","edition":"O*NET Facilities Managers 11-3013.00; Location checked: Updated 2026, definition and Tasks","region":"The country and institutional scope of the original source. Equivalence to Korean qualifications and statutory authority has not been verified.","checked_at":"2026-10-25","reuse":"Independent summaries, editorial proposals, and links to originals. Original source text is not reproduced."},{"title":"IFMA What Is Facility Management?","url":"https://www.ifma.org/about/what-is-fm/","publisher":"www.ifma.org","edition":"IFMA What Is Facility Management?; Location checked: What is facility management / What do facility managers do / Why is FM relevant","region":"The country and institutional scope of the original source. Equivalence to Korean qualifications and statutory authority has not been verified.","checked_at":"2026-10-25","reuse":"Independent summaries, editorial proposals, and links to originals. Original source text is not reproduced."}],"review":{"status":"source-checked-editorial","expert_reviewed":false},"editorial_note":"Independent, source-based editorial material. The scope of work described in occupational sources is distinguished from judgment methods proposed by the editors. No occupational expert validation or demonstration of model effectiveness has been performed. Equivalence between Korean qualifications and statutory authority and foreign roles has not been verified. Editorial English translation of the Korean edition. No professional translation or occupational expert review has been completed. Translation does not change the source jurisdiction.","language":"en","translation":{"status":"current","source_language":"ko","source_version":"kb-a91f351c3799270c","translated_at":"2026-10-30","professional_reviewed":false},"trust":"reference-data","version":"kb-51e0384c8d15b5f4","links":{"document":"/en/knowledge/p2-fm-priority","markdown":"/en/knowledge/p2-fm-priority.md","api":"/api/v1/knowledge/p2-fm-priority?lang=en"}}